Design, construction and installation of bridges and boardwalks. Designed to specification in green oak, tanalised larch or Douglas fir. Parallel routing for maintenance-free non-slip surfaces.

- Canoe Safari
- Location: Penclacwydd, Llanelli and Slimbridge, Gloucestershire
- Client: Wildfowl and Wetlands Trust
- Commissioned by W.W.T. to offer an innovative and exciting experience for visitors. We designed and installed the visitor centre, jetty and environmentally friendly bathroom facilities. The Llanelli project has been so popular that another Canoe Safari has been built in Slimbridge based on a fishermans shed and jetty.
- Date: Summer 2007 and Spring 2008
- More pictures from the Canoe Safari

- Replacement bridge, Boscastle
- Client: Carillion of the Environment Agency
- Brief: design and install a flood proof timber footbridge to replace the one washed away in 2004
- Date: Spring 2007
- More images

- "The Crannog" - Penallta Community Park
- Design, construction and installation of 85m softwood boardwalk over an artificial lake.
- The lake was drained to allow oak posts to be concreted into the bed.
- An artificial island was constructed with oak retaining structures within the lake.
- In conjunction with Mick Petts - Landscape Sculptor.

- Design, construction and installation of 200m timber causeway across the Loughor Estuary tidal flood plain.
- The causeway is supported on driven oak posts at 1.8m centres.
- Overall width 3m; with outrigger supports for the handrail; providing extra stability.

- Bridge in the Llanelli Millennium Coastal Park
- 30 metre oak trussed, steel beamed footbridge leading to the Heron's Wing Bird Hide at the Wildfowl and Wetlands Trust, Penclacwydd.
- Large crowds at the opening by Rolf Harris in July 2000